Hacker Industries Inc. - 800.642.3455 - FIRM-FILL® High Strength
...for Installing Finished Floor Coverings". The guideline is not a warranty and should be used as a guideline only. Also see ASTM F2419 for recommended procedures. 3.6 Field Quality Control Slump Test: FIRM-FILL® High Strength shall be tested for slump at the beginning of each installation in order to establish the required slump. See #5.
Xypex Corporation
Curing compounds shall comply with ASTM C-309. 3.05 PROTECTION A. Protection: Protect installed product and finished surfaces from damage during construction. 3.06 FIELD QUALITY CONTROL A. Examination for Defects: Do not conceal Xypex treated concrete before it has been observed by Architect / Engineer, waterproofing manufacturer’s... See #6.
SPECIFICATIONS - EPROSIL
Protect adjacent surfaces not scheduled to receive coating. If applied on unscheduled surfaces, remove immediately, by approved method. FIELD QUALITY CONTROL Field inspection and testing will be performed. Manufacturer of water repellant coating shall provide the inspection services as required. APPLICATION... See #7.
All Star Bleachers, Inc. Product Specs.
01 Installation All work performed by factory-trained technicians experienced in bleacher seating installation. Project as per approved shop drawings. 3.02 Field Quality Control Foundation: Footings for the grandstand shall provide sufficient bearing area at. See #8.
|