Please find below a selection of relevant articles from AEC companies and organizations for field quality control.

DHSI - Specifications
doc (MS Word) format * Click here for 08730 Specifications in.pdf (Acrobat) format Particular emphasis has been placed on testing as an operating system and Field Quality Control. There is nothing proprietary in these specs and all qualifications are found in current Nationally Referenced Standards such as NFPA 80, NFPA 101, ADA, SDI, AWI and so on. See #1.



rfasp02
...Goods to Maxxon Underlayments" brochure for guidelines for installing finished floor goods. This procedure is not a warranty and is to be used as a guideline only. 3.04 FIELD QUALITY CONTROL A. Slump Test: Rapid Radiant Green mix shall be tested for slump as it's being pumped using a 2 inch by 4 inch (50 mm by 101 mm) cylinder resulting... See #2.

SLURRY WALL CONSTRUCTION SERVICES – SLURRY WALLS CONSTRUCTION COMPANY - SLURRY TRENCH, ...
During Construction. The Contractor shall submit for approval during construction: The Contractor shall prepare and submit Quality Control Test Results of field quality control tests and inspections within 3 calendar days of performance, unless otherwise directed by the Owner/Engineer. The results shall be reported on forms accepted by submittal. See #3.

American Sprayed Fibers, Inc.
...shall be performed by a firm acceptable to the material manufacturer. 1.2.2 DENDAMIX Retrofit material shall be applied by factory trained applicators only. 1.2.3. A.S.F.I. field quality control inspector shall have immediate and unlimited access to every site at anytime during the installation process. 1.3 DELIVERY, STORAGE, AND HANDLING 1. See #4.



Hacker Industries Inc. - 800.642.3455 - FIRM-FILL® High Strength
...for Installing Finished Floor Coverings". The guideline is not a warranty and should be used as a guideline only. Also see ASTM F2419 for recommended procedures. 3.6 Field Quality Control Slump Test: FIRM-FILL® High Strength shall be tested for slump at the beginning of each installation in order to establish the required slump. See #5.

Xypex Corporation
Curing compounds shall comply with ASTM C-309. 3.05 PROTECTION A. Protection: Protect installed product and finished surfaces from damage during construction. 3.06 FIELD QUALITY CONTROL A. Examination for Defects: Do not conceal Xypex treated concrete before it has been observed by Architect / Engineer, waterproofing manufacturer’s... See #6.

SPECIFICATIONS - EPROSIL
Protect adjacent surfaces not scheduled to receive coating. If applied on unscheduled surfaces, remove immediately, by approved method. FIELD QUALITY CONTROL Field inspection and testing will be performed. Manufacturer of water repellant coating shall provide the inspection services as required. APPLICATION... See #7.

All Star Bleachers, Inc. Product Specs.
01 Installation All work performed by factory-trained technicians experienced in bleacher seating installation. Project as per approved shop drawings. 3.02 Field Quality Control Foundation: Footings for the grandstand shall provide sufficient bearing area at. See #8.

1: http://dhsi-seal.com [c1075740]
2: http://www.rapidfloor.com [c918173]
3: http://www.slurrywall.com [c1155413]
4: http://www.asfiusa.com [c997227]
5: http://www.HackerIndustries.com [c831127]
6: http://www.xypex.com [c905895]
7: http://www.eproserv.com [c1171811]
8: http://www.allstarbleachers.com [c1137961]

 





Copyright © 2004-2008 Actiosoft / Digital Business Media: compilation of news, articles, white papers and web references concerning field quality control.