AEC-CADinfo
Free Engineering Publications
Computer-Aided Design
Architecture / Engineering / Construction
News and Information on AEC-CADinfo

Directories
 
AEC Software News
 
 
 
Search
Google
web this site
News/Publications
 
Services
 
 
 

You are here:  Homepage  >  closeout submittal - submittals  >  closeout submittals

Closeout submittals

Cornell Iron Works - Accordion
...PROCEDURES, 01 62 00 PRODUCT OPTIONS, 01 25 13 PRODUCT SUBSTITUTION PROCEDURES, 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS, 01 77 00 CLOSEOUT PROCEDURES AND 01 78 00 CLOSEOUT SUBMITTALS. IF THE PROJECT MANUAL DOES NOT CONTAIN THESE SECTIONS, ADDITIONAL INFORMATION SHOULD BE INCLUDED UNDER THE APPROPRIATE ARTICLES. THIS IS AN OPEN PROPRIETARY... See #1.



Cornell Iron Works - Accordion
...PROCEDURES, 01 62 00 PRODUCT OPTIONS, 01 25 13 PRODUCT SUBSTITUTION PROCEDURES, 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS, 01 77 00 CLOSEOUT PROCEDURES AND 01 78 00 CLOSEOUT SUBMITTALS. IF THE PROJECT MANUAL DOES NOT CONTAIN THESE SECTIONS, ADDITIONAL INFORMATION SHOULD BE INCLUDED UNDER THE APPROPRIATE ARTICLES. THIS IS AN OPEN PROPRIETARY... See #2.

Northwest Rubber SportFLOOR ASTM Specs and Information
...installation adhesives, cleaners and sealers..4 Submit layout drawing of flooring [tiles] [sheets] to [Owner] [Consultant] [Engineer] for review prior to starting any work. 1.4 CLOSEOUT SUBMITTALS.1 Provide maintenance data for resilient flooring for incorporation into maintenance manual specified in Section [ ] – [ ]. 1.5 EXTRA MATERIALS.1 Provide... See #3.

Powerflex Xcel™ | Modular Electrical System Specifications & Testing
...01620–PRODUCT OPTIONS, 01630–PRODUCT SUBSTITUTION PROCEDURES, 01660–PRODUCT STORAGE AND HANDLING REQUIREMENTS, 01770–CLOSEOUT PROCEDURES, AND 01780–CLOSEOUT SUBMITTALS. CLOSE COORDINATION WITH DIVISION 1 SECTIONS IS REQUIRED. IF THE PROJECT MANUAL DOES NOT CONTAIN THESE SECTIONS, ADDITIONAL INFORMATION SHOULD BE INCLUDED... See #4.

CEP-Panels: Distributor of Petrarch, Fasset, and Stoneflex architectural building panels.
...treatment immediately if panels are soiled or scratched. Carry panels on edge and handle carefully to avoid damage to surfaces and corners. WARRANTY See Section 01780 - Closeout Submittals, for additional warranty requirements. Comply with manufacturer's project review requirements and notification procedures to assure qualification for warranty. See #5.



1: http://www.cornelliron.com [c1171130]
2: http://www.cornelliron.com [c1253056]
3: http://www.northwestrubber.com [c1000688]
4: http://www.cablefloor.com [c997681]
5: http://www.cep-panels.com [c1139018]

 





Copyright © 2004-2008 Actiosoft / Digital Business Media: compilation of news, articles, white papers and web references concerning closeout submittals.