AEC-CADinfo
Free Engineering Publications
Computer-Aided Design
Architecture / Engineering / Construction
News and Information on AEC-CADinfo

Directories
 
AEC Software News
 
 
Search
Google
web this site
News/Publications
 
Services
 
 
 

You are here:  Homepage  >  notice to proceed

Notice to proceed

E/One Sewer Systems: Grinder Pump Specifications
For ease of serviceability, all pump motor/grinder units shall be of like type and horsepower throughout the system. 1.02 SUBMITTALS: After receipt of notice to proceed, the MANUFACTURER shall furnish a minimum of six sets of shop drawings detailing the equipment to be furnished including dimensional data and materials of construction. See #1



E/One Sewer Systems: Lateral Kit Specifications
Completed assembly shall be as provided by Environment One Corporation, Niskayuna, New York, or approved equal. Shop Drawings After receipt of notice to proceed, the MANUFACTURER shall furnish a minimum of six (6) sets of shop drawings detailing the equipment to be furnished including dimensional data and materials of construction. See #2

Western Railco Products Ltd. - Leading North American Aluminum Railing Manufacturer
3 SUBMITTALS: Provide shop drawings and product data under provisions of Section (01300) Within thirty calendar days after the contractor has received the owner’s notice to proceed, submit shop drawings that indicate scope of project, component details, materials, finish, fasteners and anchorage methods, and the relationship to... See #3

1: http://www.eone.com [c1139997]
2: http://www.eone.com [c469889]
3: http://www.railcraft.com [c188630]