Cornell Iron Works - Accordion
THIS SECTION ASSUMES THE PROJECT MANUAL WILL CONTAIN COMPLETE DIVISION 01 DOCUMENTS INCLUDING SECTIONS 01 33 00 SUBMITTAL PROCEDURES, 01 62 00 PRODUCT OPTIONS, 01 25 13 PRODUCT SUBSTITUTION PROCEDURES, 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS, 01 77 00 CLOSEOUT PROCEDURES AND 01 78 00 CLOSEOUT SUBMITTALS. IF THE PROJECT MANUAL DOES... See #2.
Cornell Iron Works - Accordion
THIS SECTION ASSUMES THE PROJECT MANUAL WILL CONTAIN COMPLETE DIVISION 01 DOCUMENTS INCLUDING SECTIONS 01 33 00 SUBMITTAL PROCEDURES, 01 62 00 PRODUCT OPTIONS, 01 25 13 PRODUCT SUBSTITUTION PROCEDURES, 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS, 01 77 00 CLOSEOUT PROCEDURES AND 01 78 00 CLOSEOUT SUBMITTALS. IF THE PROJECT MANUAL DOES... See #3.
Crawl Space Vent Crawlspace Vents
...Pelham, New Hampshire 03076; 800-325-4115; www.sunventindustries.com. B. Manufacturers of equivalent products submitted and approved in accordance with Section 01630 - Product Substitution Procedures. 2.2 MATERIALS A. Extruded aluminum: [0.125 inch] [3 mm] minimum thickness extruded aluminum complying with ASTM B221, Alloy 6063, Temper T-5. See #4.
E. Dillon & Company
O. Box 160, Swords Creek, Virginia 24649; 800-234-8970. B. Manufacturers of equivalent products submitted and approved in accordance with Section 01630 - Product Substitution Procedures. Architect reserves right to reject C. Substitution request based on aggregate, color, polished surface, and gloss, even though structural characteristic, ... See #5.
|