Access Panels by Profab Access Ltd UK - 3000 SERIES Concealed Loft Access Panel for...
...Push Catch [ PC ] Security Lock [ SL ] FIRE PERFORMANCE The 3000 series panel is a non-fire rated product and so no claims are made. TYPICAL DETAILS All fixings and packing by contractor unless stated otherwise. INTRODUCTION The Profab 3000 series 'Loft Hatch' is designed to provide access between into 50mm wide timber truss/ joisted plaster/plasterboard... See #2.
Advance Corporation - Braille-Tac? Division
Other applications include industrial machinery panels, ATM faceplates, and recognition/dedication plaques. AI ? ASSEMBLY and INSTALLATION Factory made and site installed by Contractor. Installation instructions are available. Installation is compatible with Federal and State code requirements. Mount metal plates in accordance with State and Federal codes. See #3.
Accutrack for acoustical wall panels, ceiling baffles, tackboards and hometheater.
...fabric panels with protective sheeting until space is ready for occupancy. PART 4 - FABRICS A-Manufacturers standard or customer's own material. B-All fabrics shall be approved by contractor to insure suitability. C-The following information shall be submitted by the architect for each fabric specified. 1. Fabric manufacturer: 2. Width of fabric: 3. See #4.
Advance Corporation - Braille-Tac? Division
...effect after repeated use of cleaners such as Graffiti Remover #1120 manufactured by Fine Organics Corp., Lodi, NJ. AI ? ASSEMBLY and INSTALLATION Factory made and site installed by Contractor. Installation instructions are available. Installation is compatible with Federal and State code requirements. Mount Photopolymer ADA signs in accordance... See #5.
Plastic Prefabricated Piping Systems
...joint permits an angular deflection of 2 degrees at the joint. CAUTION When utilizing gasket joints, provisions to eliminate thrust must be part of the installation and design by contractor. Easy, 3-Step Joint Assembly 1. Make certain that the pipe end, or spigot and gasket area are clean and free of dirt. However, the multi-lip gasket design... See #6.
Performance Oriented Specifications For Hot Dip Galvanizing And Shop Painting Of Hot Dip...
...and the applicable ASTM Specification Numbers. 1.04 QUALITY ASSURANCE A. Pre-Construction Conference for Metal Fabrications: Contractor shall schedule a meeting to be attended by Contractor, Authority, fabricator, and galvanizer. Agenda shall include the following: Project schedule, scope of metal fabrications, coordination between fabricator... See #7.
Mitten Vinyl -
Mitten News
...through the VSI Vinyl Siding Product Certification Program. Mitten has had winning entries for the past four years! This year's winning entry came from BSZ (Builder Supply Zone) by contractor John Heddon in Dalton, GA. Click for more details on this entry and other winning entries in the VSI Awards of Distinction. Sweets Directory The Sweets... See #8.
Specifications
Four (4) 2" x 2" x 1/4" anchor brackets welded to the exterior base of building as specified. Unit to be installed and sealed on a minimum 2500 psi concrete slab by contractor. 3.4 WALL PANELS: 14 gauge galvanized steel exterior panels fabricated and fitted between vertical and horizontal posts. Overall wall thickness shall be 2. See #9.
Dynaflex Application Specification for Concrete - 02792
...to remain above fifty (50) degrees F. for four (4) hours after completing application. 1.07 WARRANTY A. Prior to final payment, submit two (2) year written warranty signed by contractor and materials manufacturer. PART 2 - PRODUCTS 2.01 ACCEPTABLE PRODUCTS - all by Neyra Industries of Cincinnati, Ohio. A. Primer: Dynabond Primer. B. Color... See #10.
About the Door Frame for our Heavy Duty One-Piece Hydraulic Doors
• Inside liner sheeting doors may be finished off with sheeting. • Alternate exterior siding / skins. • Decorative door covering: Many choices to pick from a by contractor or customer. • Stucco • Decorative Siding • Cedar Siding • Decorative Wood • Total Glass • Home Siding • Translucent... See #11.
Specifications/Installation
III. Specific stains selected by the Architect to be applied over SanFoot must have 1-2 coats of polyurethane applied. Samples must be submitted by contractor for approval. Follow the manufacturer's staining and finishing instructions. 3.6 Clean Up and Protection: a. Upon completion of installation, the installer... See #12.
|