A-Turf | 3-Part Spec | Premier-RS 50/2.5 M
...manuals will include all necessary instructions for the proper care and maintenance of the newly installed synthetic turf system. 1.02 SUBMITTALS Submit the following within 48 hours of bid opening: Three (3) copies of most recent installation/reference list for all projects of similar scope to this project completed in the last thee years. Three... See #2.
GAW (Galvanized After Weaving) Chain Link Fence Fabric manufactured and distributed by...
01 SECTION INCLUDES A. Galvanized after weaving (GAW) coated chain link fencing and accessories. 1.02 SUBMITTALS A. Changes in specifications may not be made after the published date of bid. All submittals of substitutions must be approved before bid date. B. Shop drawings of fences and gates with all dimensions, details, and finishes. Drawings... See #3.
Ordering Information
Kick plates are not normally templated, but are available as a special. Price and delivery quotations on specific jobs are based on current conditions at the time of bid. Unless we specify otherwise, there is no time limit on your price. We reserve the right to correct clerical and typographical errors. We furnish fastenings with all of our items. See #4.
Bonin Architects & Associates Fee Structure | Timber Frame Design & Project Management
...grade living spaces Prints & Shipping: Preliminary Design Phase Services: • 2 printed sets & USPS shipping per revisions (if requested) • 5 printed sets & USPS shipping of Bid Sets to client & selected manufacturers & contractors for the timber frame or post and beam and structural insulated panels ( SIPs ) Construction... See #5.
Hubbellite 300 Specifications
NFPA Bulletin #56-A D. Contractor Prequalification Requirements: 1. Each bidder for this project shall be a prequalified and approved Hubbellite installer at the time of bid submittal. 2. Each approved applicator shall have been prequalified in all phases of surface preparation and application of the specified flooring system. See #6.
Specifications
2. No substitutions will be considered unless written request for approval is received in the architect's office at least fifteen days prior to date for receipt of bid. Each such request shall include the name and description of the proposed substitute, drawings, details, cuts, mock-ups, performance and test data, a list... See #7.
Akron CSO Rack 40 & 31
During design phase, H.R. Gray provided constructability reviews, cost estimating and value engineering. H.R. Gray assisted the City of Akron in preparation of bid documents, bid evaluation and awarding of the contracts. H.R. Gray is responsible for the construction management and coordination of multiple contractors, ... See #8.
|