BOMA/ANSI Standard Method for Measuring Floor Area in Office Buildings; BOMA
Plans
...information on-line, making it available to the entire property management team. Prime Edge Asbuilt Services initiates the se-up for the structure, giving the property manager initial set-up settings, which can later be modified with changes in occupancy. Prime Edge's BOMA plan management system currently does not support In the 1980 Standard... See #5.
rfuG560
...Rapid Floor Ultra as continuously as possible until application is complete so that no Rapid Floor Ultra slurry is placed against Rapid Floor Ultra product that has obtained its initial set. C. Application of Optional Sound Mats: If this option is chosen it replaces B above. Place Rapid Floor Ultra overthe tops of the flutes to a smooth surface. See #6.
Overview of TimeLiner
| NavisWorks
...tasks, each having a name, start and end date and a task type. You can enter tasks by hand on the Tasks Tab. Alternatively, the Tools context menu on the Tasks Tab will create an initial set of tasks based on layer, item, or selection set names. TimeLiner defines some default task types for you (Construct, Demolish and Temporary), or you can... See #7.
Hacker Industries Inc. - 800.642.3455 - FIRM-FILL® High Strength
...Place as continuously as possible until installation is complete so that no FIRM-FILL® High Strength slurry is placed against FIRM-FILL® High Strength that has obtained its initial set, except at authorized joints. FIRM-FILL® High Strength is suitable for interior applications only and must be covered by a finished floor material. See #8.
Davis Colors™: Color Seal II™
1 kg) each. Surface Preparation FRESH COLORED CONCRETE: Apply after all bleed water and surface sheen has evaporated, finishing has been completed and concrete has achieved an initial set HARDENED COLOR CONCRETE: Clean surface or oil, grease, dust, dirt or foreign matter. Rinse with water. OLD, DUSTY COLORED CONCRETE: Clean surface or oil, ... See #9.
Elsro, Inc. - Installation, Protection, and Maintenance Products
MIXING Add Patch-All powder to water and mix for at least 3 minutes with a drill mounted mixer. APPLICATION Place Patch-All with a trowel. When Patch-All starts to obtain initial set, steel trowel to desired finish. ELSRO ADHESIVE DESCRIPTION Elsro Adhesive is a non-toxic, non-flammable, rubberized asphalt emulsion. USES Elsro Adhesive... See #10.
Ceramic Glazed Masonry Institute
On-Going Maintenance of Installed Units (also read above information) Use 1" (or larger) non-metallic jointer to strike joints when thumb print hard. After initial set (won't smear), clean area using a wood tool/stick to remove clumps of mortar. Then wipe wall with course rag (burlap, carpet, etc.). Shake rag to clean often. See #11.
Pacific States Pipes
Each step of the operation is inspected frequently: pipe interior preparation, mortar mixing, centrifugal distribution of mortar into pipe, lining smoothness, initial set, and seal coating. It is our intent that this lining exceed the requirements of ANSI/AWWA Standard C104/A21.4 and that it will serve its intended functions... See #12.
About Tripolymer 105-TM
When the resin is combined with our Tripolymer® foaming agent, a synthetic catalyst causes a molecular cross-linking to occur. Within 60 seconds, the initial set or gelling has taken place. From this point on, the foam continues to cure and attain its final properties. Curing takes place regardless of whether the... See #13.
CONCRETE ADMIXTURES BY SIDER-OXYDRO, INC.
Oxy -Plast - Our chloride free admixture that produces a concrete with a lower water to cement ratio and yields greater plasticity with slight initial set retarding properties. Oxy-Plastair - A ready-to-use, air-entraining & plasticising admixture for concrete featuring the benefits of plasticity &... See #14.
BMI Products: Special: Ultra Coat
Always work to a wet edge to avoid cold joints. Curing/Drying UltraKote must be kept moist for at least 48 hours. Start light fogging after initial set, 1-2 hours. Fully cured in 28 days. Clean Up Clean tools and equipment with water immediately after use. Click on “The Clean Choice” Home |... See #15.
The Second Pass With Stainless Trowels
Photograph #10 - The Second Pass On Pegged Kneeboards After the initial set, a second pass with stainless steel trowels increases surface density PREVIOUS PHOTO | HOME | NEXT PHOTOGRAPH. See #16.
|